Sign In | Join Free | My adobecards.com |
|
Brand Name : Harzone
Place of Origin : China
MOQ : negotiation
Payment Terms : According to detailed order
Delivery Time : negotiation
Packaging Details : According to detailed order
Material : steel
Feature : Reusable
Capacity : Heavy loading capacity
Status : Sefl Fold and Unfold
Product name : Tracked Load LD-60 Emergency Bridge Mechanized Bridge
Condition : New
Warranty : 1 Year
Application : emergency bridges
Span : 17-51m
Tracked Load LD-60 Emergency Bridge Mechanized Bridge
Description:
Tracked Load LD-60 Emergency Bridge Mechanized Bridge is a set of mechanized bridge with big single span accepted by vehicle. One complete set of equipment consists of one erection vehicle and six transport vehicles with bridge bays, which can be assembled into an emergency bridge rapidly to ensure all sorts of vehicles to go across quickly.
Tracked Load LD-60 Emergency Bridge Mechanized Bridge possesses the feature of decent flexibility, large single span, humble structure, quick erection, high mechanization and less manpower. Moreover, it has the benefits of suitable transportation and favorable adaptability of bank.
Specification: |
Curb weight of erection vehicle (including 3 men) 32.5t |
Curb weight of transport vehicle 20.8t |
Bridge bay weight: 9.2t |
Design load: tracked load LD-60 |
Wheeled (load on axle) LT-20 |
Erection length 17m, 25.5m, 34 m, 42.5 m, 51 m |
Erection width 4m |
Erection time (complete bridge) 75min |
Retrieval time (complete bridge) 75min |
Operator 6~7 men (not including drivers of transport vehicles) |
Tracked Load LD-60 Emergency Bridge Mechanized Bridge is used to fast erect a temporary bridge of 17-51m, 4m wide to ensure all sorts of vehicles with the tracked load of up to 60t or an axle load of up to 13t to go across obstacles including rivers and dry ditches.
![]() |
Tracked Load Steel Bridge Ld-60 Emergency Mechanized Images |