Sign In | Join Free | My adobecards.com
China CHINA HARZONE INDUSTRY CORP.,LTD. logo
CHINA HARZONE INDUSTRY CORP.,LTD.
CHINA HARZONE INDUSTRY CORP.,LTD. PROVIDE THE CUSTOMERS WITH ASSURANCE AND SUCCESS. TO ESTABLISH THE FIRST BRAND OF EMERGENCY EQUIPMENT IN CHINA
Verified Supplier

13 Years

Home > Mechanized Bridge >

Erection Width 4m Axle Load Lt-20 Modular Steel Bridge Simple Structure

CHINA HARZONE INDUSTRY CORP.,LTD.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Erection Width 4m Axle Load Lt-20 Modular Steel Bridge Simple Structure

Brand Name : Harzone

Place of Origin : China

MOQ : negotiation

Payment Terms : According to detailed order

Delivery Time : negotiation

Packaging Details : According to detailed order

Material : Steel bridge

Feature : Reusable

Capacity : Heavy loading capacity

Structure : Simple

Status : Sefl Fold and Unfold

Contact Now

Erection Width 4m Axle Load Lt-20 Simple Structure Mechanized Bridge

Description:

Erection Width 4m Axle Load Lt-20 Simple Structure Mechanized Bridge is used to fast erect a temporary bridge of 17-51m, 4m wide to ensure all sorts of vehicles with the tracked load of up to 60t or an axle load of up to 13t to go across obstacles including rivers and dry ditches.

Erection Width 4m Axle Load Lt-20 Simple Structure Mechanized Bridge possesses the feature of good flexibility,simple structure, large single span, high mechanization, speedy erection and less manpower. Besides.

It has the advantages of convenient transportation and favorable adaptability of bank.

No Item Data
1 Curb weight of erection vehicle 33t
2 Curb weight of transportation vehicle 21t
3 Dimension of erection vehicle (L×W×H ) 13.6m×3.2m×3.47m
4 Dimension of transportation vehicle (L×W×H ) 12m×3.4m×3.5m
5 Load capacity
Tracked load 60T
Wheeled load 13T
6 Life time 10000 times
7 Erection length 17m,25.5m,34m,42.5m,51m
8 Erection width 4m
9 Negotiating depth: ±3m
10 Erection maximum longitudinal gradient 10%
11 Erection maximum transverse gradient 5%
12 Erection time (complete bridge) 90min
13 Retrieval time (complete bridge) 90min
14 Operator(not including driver) 3~4
15 Ambient temperature -41℃~+50℃

Erection Width 4m Axle Load Lt-20 Modular Steel Bridge Simple Structure

Erection Width 4m Axle Load Lt-20 Modular Steel Bridge Simple Structure

China Harzone is one of the most professional “steel truss bridge” manufacturers all over the world and we always make our effort to provide our best service and products to our clients. So far, over 40 countries in Asia, Africa and Latin America have purchased our products, including Myanmar, Thailand, Peru, Ecuador, Sudan, Pakistan, Laos and so on.
China Harzone has enjoyed a proud history, it must also create a bridge future.


Product Tags:

Lt-20 Modular Steel Bridge

      

4m Modular Steel Bridge

      

4m temporary modular bridge

      
 Erection Width 4m Axle Load Lt-20 Modular Steel Bridge Simple Structure Manufactures

Erection Width 4m Axle Load Lt-20 Modular Steel Bridge Simple Structure Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: CHINA HARZONE INDUSTRY CORP.,LTD.
*Subject:
*Message:
Characters Remaining: (0/3000)