Sign In | Join Free | My adobecards.com
China CHINA HARZONE INDUSTRY CORP.,LTD. logo
CHINA HARZONE INDUSTRY CORP.,LTD.
CHINA HARZONE INDUSTRY CORP.,LTD. PROVIDE THE CUSTOMERS WITH ASSURANCE AND SUCCESS. TO ESTABLISH THE FIRST BRAND OF EMERGENCY EQUIPMENT IN CHINA
Verified Supplier

13 Years

Home > Bailey Bridge >

CB200 Panel Bridge Temporary Steel Bridge

CHINA HARZONE INDUSTRY CORP.,LTD.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

CB200 Panel Bridge Temporary Steel Bridge

Brand Name : China Harzone

Certification : ISO9001:2015

Place of Origin : Hubei,China

MOQ : 1set

Price : Negotiated

Supply Ability : 40000 Ton/Tons per Year

Standard : AiSi, ASTM, BS, GB

Grade : Q345B-Q460C

Type : Temporary Bridge

Application : Steel Structure Bridge

Processing Service : Bending, Welding, Decoiling, Cutting, Punching

Certificate : ISO9001:2015

Color : According to Requirement

Structure type : Steel Truss Bridge

Installation : Engineers Guidance

Contact Now

CB100 Designed Span Temporary Steel Bridge Bailey Truss Bridge


CB200 Panel Bridge Temporary Steel Bridge​ Description:

CB200 Panel Bridge Temporary Steel Bridge is portable steel bridge ,It has been widely used in various fields, its most important feature is to achieve a variety of spans, bear carrying capacity, light and handy components, easy to dismantle and strong adaptability can be quickly completed with simple tools and manpower.

The basic component of CB200 panel bridge consists of girder, deck, frame connecting structure, bridge end structure and gateway structure. The girder is composed of panel, panel pin (include safety circlip) and chord reinforcement. The deck is composed of transom, bridge plate and kerb. The frame structure is composed of raker, bracing frame, vertical frame, sway brace and vertical component. The bridge end section is composed of end post, lower bearing and frame plate. The gateway structure is composed of ramp, ramp bearing and end plate.


CB200 Panel Bridge Temporary Steel Bridge surface protection can be paint or hot-dip galvanized.

CB200 Panel Bridge Temporary Steel Bridge adopts modular design, featuring a large span,short construction period,fast erection, multiple reuses of bridge components. It has excellent interchangeability and connection ferformance. The bridge structure can be designed according to the bridge span and load requirement,which can quickly construct a temporay or semi-permanent bridge.

CB200 Panel Bridge Temporary Steel Bridge​ Specifications:

Type CB100
Designed Span 6-60m
Designed Load HS25-44,Axle Load 20t,tracked load 50t
Panel Dimension 1.448*3.048m
Carriageway Width 4.2m/7.35m
Deck type steel deck/ wood deck

CB200 Panel Bridge Temporary Steel Bridge​ Advantage:


Possessing the features of simple structure,
great stability and long fatigue life
being capable of an alternative span, loading capacity
easy disassembling,
heavy loading capacity,

CB200 Panel Bridge Temporary Steel Bridge

CB200 Panel Bridge Temporary Steel BridgeCB200 Panel Bridge Temporary Steel Bridge


Product Tags:

CB200 Panel Bridge

      

CB200 Temporary Steel Bridge

      

Bailey Temporary Steel Bridge

      
 CB200 Panel Bridge Temporary Steel Bridge Manufactures

CB200 Panel Bridge Temporary Steel Bridge Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: CHINA HARZONE INDUSTRY CORP.,LTD.
*Subject:
*Message:
Characters Remaining: (0/3000)