Sign In | Join Free | My adobecards.com |
|
Brand Name : China Harzone
Certification : ISO9001:2015
Place of Origin : Hubei,China
MOQ : 1set
Price : Negotiated
Supply Ability : 40000 Ton/Tons per Year
Name : 54m Emergency Bridge Steel Truss Bridge
Grade : Q345B Steel
Type : Steel Bridge
Processing Service : Bending, Welding, Decoiling, Cutting, Punching
Certificate : ISO9001:2015
Color : According to Client Requirement
Structure type : Bailey bridge Bridge
Installation : Engineers Guidance
54m Emergency Bridge Steel Truss Bridge
Description of 54m Emergency Bridge Steel Truss Bridge
54m Emergency Bridge Steel Truss Bridge adopts prefabricated strategy, featuring a big span, small construction period, steadfast erection, multiple reuses of bridge components.54m Emergency Bridge Steel Truss Bridge has outstanding interchangeability and connection ferformance. 54m Emergency Bridge Steel Truss Bridge structure can be designed according to the bridge span and load requirement,which can rapidly construct a impermanent or semi-permanent bridge.
54m Emergency Bridge Steel Truss Bridge surface protection can be paint or hot-dip galvanized.
Advantage of 54m Emergency Bridge Steel Truss Bridge:
Possessing the features of simple structure,
great stability and long fatigue life
being capable of an alternative span, loading capacity
Specifications of 54m Emergency Bridge Steel Truss Bridge:
Type | CB100 |
Designed Span | 6-60m |
Designed Load | HS25-44,Axle Load 20t,tracked load 50t |
Panel Dimension | 1.448*3.048m |
Carriageway Width | 4.2m/7.35m |
Deck type | steel deck/ wood deck |
![]() |
54m Emergency Prefabricated Truss Bridge Bailey Images |